AC bridge
German title: | AC-Brücke | |
Acronym: | AC-Brücke | |
Duration: | 1st June 2016 - 30th November 2018 | |
Description: | The aim was to significantly improve the signal-to-noise ratio of piezoresistive measuring bridges in order to increase the range of applications. The required sensitivity is determined by only two quantities, the signal-to-noise ratio and the stability of the sensor signal. In the project, novel technical approaches for the significant improvement of both quantities were demonstrated. A new readout concept for bypassing the 1/f noise and an improvement of the stability of the sensor signal was developed. | |
Funded by: | BMWI | |
Project sponsor: | EuroNorm GmbH | |
Funding code: | MF150187 |